Follow this comprehensive SimCity 4 guide to build Villa San Girolamo from Year 1 to Year 10, covering residential, commercial, industrial zoning, and essential services.
Walkthrough
- 1Year 0-2: Foundation and Initial Services
- Establish 1 Coal Power plant (funding: 1).
- 2Set up Waste to Power with zero funding.
- 3Zone Residential, Commercial, and Industrial areas according to the LERS concept.
- 4Place 4 Elementary Schools, 1 Hospital, 1 High School, and 2 Tennis Courts to cover the residential area. Ensure services are funded according to LERS to avoid financial issues.
- 5Consider a Water Tower or Pump; a pump may be necessary within a year due to high usage.
- 6Implement the Clean Air Act and establish Connections.
- 7Starting cash balance: $22,619.
- 8Year 1: Villa San Girolamo - Initial Growth
- Population: 2300, Income: $1487, Funds: $24,505.
- 9Zone Residential, Commercial according to city plan and LERS diagram.
- 10Place 1 High School, 1 Elementary School, and 1 Hospital.
- 11Year 2: Consolidation
- Population: 3164, Income: $2638, Funds: $1,703.
- 12No construction needed.
- 13Year 3: Expansion and Education
- Population: 2909, Income: $2725, Funds: $35,463.
- 14Zone remaining Residential, Commercial areas of LERS.
- 15Place 3 Elementary Schools, 2 Hospitals to cover LERS.
- 16Build 1 City College in an area not slated for future construction.
- 17Year 4: Civic Amenities and Infrastructure
- Population: 5572, Income: $4235, Funds: $29,264.
- 18Place 2 High Schools to cover LERS.
- 19Build 1 Small Fire Station to cover the industrial area.
- 20Construct 6 Tennis Courts.
- 21Place the Mayor House within the LERS.
- 22Year 5: Further Development and Services
- Population: 9888, Income: $4839, Funds: $57393.
- 23Zone 1 Full Residential (ORS).
- 24Place 4 (6x10) Commercial zones with a 4-tile space after the third zone.
- 25Build 1 Elementary School, 1 High School, 1 Hospital, and 2 Tennis Courts at the new (ORS). Ensure bus/ambulance coverage is normal.
- 26Place 1 Water Pump when needed.
- 27Year 6: Continued Residential and Service Growth
- Population: 13,056, Income: $6176, Funds: $60,504.
- 28Zone 1 Full Residential (ORS).
- 29Implement Smoke Ordinance.
- 30Build 1 Hospital, 1 Elementary School, and 1 High School at the new (ORS).
- 31Year 7: Landmarks and University
- Population: 14,927, Income: $6983, Funds: $75,421.
- 32Build an Air Base and a University.
- 33Place the Mayor Statue in the LERS, between the top right commercial and residential zones.
- 34Construct 1 Large Plaza in the LERS, between the bottom left commercial and residential zones, in the designated slot.
- 35Year 8: Partial LERS Development
- Population: 17,785, Income: $7631, Funds: $96,588.
- 36Zone a partial LERS for Residential, Commercial, and Industrial areas.
- 37Build 1 Softball field in the new partial LERS, between the top left industrial and residential zones.
- 38Place 1 Large Plaza in the new partial LERS, between the top right commercial and residential zones.
- 39Construct 5 Elementary Schools, 3 High Schools, and 3 Hospitals to cover the new partial LERS.
- 40Year 9: Finalizing LERS and Special Buildings
- Population: 23,000, Income: $9214, Funds: $86,799.
- 41Zone the last row of the new LERS with 2 (6x8) and 2 (8x8) Industrial zones.
- 42Place an Impressive Mayor Statue in the old full LERS, between the bottom right commercial and residential areas.
- 43Build 1 Large Flower Garden and 1 Large Plaza in any old full LERS designated park areas not yet filled.
- 44Construct 2 Tennis Courts and 2 Skateboards at the new partial LERS, in designated court areas.
- 45Build 1 Coal Power Plant at the power plant area.
- 46Place the Advanced Research Centre away from residential areas, beside the air force base.
- 47Year 10: Financial Overview
- Population: 30,333, Income: $10160, Expense: $6115, Net Income: $4045, Funds: $116,391.
- 48Commercial: 12,385, Industrial: 2514.
Notes:
- The LERS (Local Economic Residential Strategy) concept emphasizes balanced development and service funding.
- Maintain adequate funding for all services to prevent financial strain.
- Monitor pollution data view and allow high-tech industry to naturally replace polluting industries.
- Pay attention to specific placement instructions for buildings and zones to maximize efficiency and meet LERS requirements.
100% Human-Written. AI Fact-Checked. Community Verified. Learn how AntMag verifies content